My contractor who is resurfacing my pool snd retiling it asked me if i wanted to fill the increasing gap between the coping and concrete pebble gravel deck. This pool is over 25 years old and the coping gap has widened over time as the deck settled and pulled away.
I did some online research and apparently it’s recommended to put backer tod in the gaps and fill them with a polyeurathane caulk material.
Before I could speak with him, he filled the gaps with concrete. Is this ok? What is the impact on my pool? I live in Houston where the temps reach 90-100 degrees consistently. Will this damage the pool?
Hes charging me $300 to do this but doesnt look like it took very long?
I did some online research and apparently it’s recommended to put backer tod in the gaps and fill them with a polyeurathane caulk material.
Before I could speak with him, he filled the gaps with concrete. Is this ok? What is the impact on my pool? I live in Houston where the temps reach 90-100 degrees consistently. Will this damage the pool?
Hes charging me $300 to do this but doesnt look like it took very long?