My pool build nightmare continues......
My builder is now trying to charge me $200 to hook up my pump because the contract called for a 2HP VS and I bought a 3HP VS instead. Is there any reason that my pump would cost more money to hook up?
They are also trying to charge up for setting the jump rock. If the rock weighs over 1200 and just a couple edges will be over the side would I even need to set it in concrete?
They also just informed me that they "can't hook the heater up to the gas meter so I'll need to find someone that can do that".
So frustrated and upset that I took a chance with these people. Every day it gets worse. Our inspector came this morning to do the electrical inspection and instead left a tag of non-compliance because the building permit was not posted. 30 minutes after he left the pool builder drives up and gets out of his truck holding the permit. Why it was removed from my property to begin with I have no idea. We were suppose to have pebble done today and now I don't even know if we can. This was the 5th day that we were told pebble would be done over the past month.
My builder is now trying to charge me $200 to hook up my pump because the contract called for a 2HP VS and I bought a 3HP VS instead. Is there any reason that my pump would cost more money to hook up?
They are also trying to charge up for setting the jump rock. If the rock weighs over 1200 and just a couple edges will be over the side would I even need to set it in concrete?
They also just informed me that they "can't hook the heater up to the gas meter so I'll need to find someone that can do that".
So frustrated and upset that I took a chance with these people. Every day it gets worse. Our inspector came this morning to do the electrical inspection and instead left a tag of non-compliance because the building permit was not posted. 30 minutes after he left the pool builder drives up and gets out of his truck holding the permit. Why it was removed from my property to begin with I have no idea. We were suppose to have pebble done today and now I don't even know if we can. This was the 5th day that we were told pebble would be done over the past month.