I have been trying to find a relative answer on the average time it takes to get the pool "swim" ready after it is filled. We are looking at getting a gunite pool and I know that they have to do some type of special post water fill process to help cure the plaster (not for sure if all gunite pools have plaster). Looking at the current build time of house, we should be finished by first of August. I am trying to figure out about when after that can we reasonably expect to have a pool safe to swim in, assuming we finish Aug 1 and fill the pool on the same day.
Getting very antsy with the build process, would love to have at least month or two in the pool, we usually are in the lake until Oct, lake temps get below 70, I figure a pool would be closely the same.