Yes I have a nightmare. Plaster sub did two terrible quartz jobs so now trying pebble. I guarantee they will throw the hose in and I won’t hear or see anyone again. Today was surprise plaster after weekly contact for a year. Yes they did a full chip out begrudgingly. Hoping for best result and going to try the Bicarb startup myself. I do have my TF test kit. Tested my fill water and here are my results
TA -150
CH - 200
PH - 7.2
Chlorine - 0
I am going to use to 5 gal bucket method and try to keep up with every 1000 gal. I am assuming they are doing an acid wash tomorrow then will fill. Least that is what they did with quartz jobs.
I will test water in pool again and walk thru the results. If I am doing right, if I used above readings for a 15k gal pool I would add 10 lbs of baking soda. Is my PH ok at 7.2? If I remember right pool fills in about 30 hours. We have terrible water pressure.
Any other advice? And I guess there is no chance we will get to use for 4 th of July. These 100+ temps looking at a cement hole have not been fun.
Thanks in advance for help and advise.
TA -150
CH - 200
PH - 7.2
Chlorine - 0
I am going to use to 5 gal bucket method and try to keep up with every 1000 gal. I am assuming they are doing an acid wash tomorrow then will fill. Least that is what they did with quartz jobs.
I will test water in pool again and walk thru the results. If I am doing right, if I used above readings for a 15k gal pool I would add 10 lbs of baking soda. Is my PH ok at 7.2? If I remember right pool fills in about 30 hours. We have terrible water pressure.
Any other advice? And I guess there is no chance we will get to use for 4 th of July. These 100+ temps looking at a cement hole have not been fun.
Thanks in advance for help and advise.