hi, its been a month since i filled my 36000 litre / 10000 gallon pebblecrete pool and i have read not to start up chlorinator or put salt in for the first month, so i am at 1 month and have salt ready to go , my chlorinator says it runs at 4000ppm, the chart i read says put in 140 kg of salt, 7 bags, can i ask a few tips here
1 do i put all salt in or do it over days
2 do i run salt water thru filter while its dissolving or put it on re-circulate, i think that bypasses filter no sure
3 i know turn off swg cell but while salt dissolves , how long before i can switch on the swg chlorinator
if i am asking wrong questions or not asking enough sorry i am winging it here, but you guys got me thru the chemical process now its time to startup the swg , thanks
1 do i put all salt in or do it over days
2 do i run salt water thru filter while its dissolving or put it on re-circulate, i think that bypasses filter no sure
3 i know turn off swg cell but while salt dissolves , how long before i can switch on the swg chlorinator
if i am asking wrong questions or not asking enough sorry i am winging it here, but you guys got me thru the chemical process now its time to startup the swg , thanks