We had the coping and tile replaced during our pool re-plastering. The tile guys set the spillway lower than where our old one was. The old spillway was 4" above the bottom of the tile. The new spillway is 3 5/16" from the bottom.
Pool company says this is the "standard way" they set spillways. I think they screwed up. Should I have them redo the spillway tile to bring it up to 4"?

Pool company says this is the "standard way" they set spillways. I think they screwed up. Should I have them redo the spillway tile to bring it up to 4"?