Started trenching the gas line last night. Have 63 feet and half of it is over underground utilities so I figured I may as well do it all by hand.
Got about 35' done but cant make it all the way down to the 24" depth mark as there is still some frost down there. Also have to trench the power line line which will be 48 feet. Skidsteer will be here good friday to level the actual pool area. The stakes you see are just to mark off the northern most edge of the deck and equipment pad. Wife picked up the gas line today. Once I hear back from the inspector on what electrical I can use, I can order that. My plumber was telling me in our area as of sept 2018 even TECK CABLE has to be in conduit. Our goal is to be up and running by May 01.