So we finally broke ground this weekend and the backyard is a mess. We drained just after labor day and my paver contractor broke up the deck and about half of the coping in 1 day.
Work scheduled to be done/installed:
Pool:
Stonescape Pebble finish
Hayward LED colorlogic light
New tile (waterline/trim/mosaic)
Equipment to be installed:
Aquarite salt system
Hayward 400,000 BTU Heater
New equipment pad
Tristar pump
Plumbing:
Skimmer, auto cleaner line, 3 return lines, main drain split, auto-fill water leveling w/ overflow baffle, backwash line to sewer
Gas line for fire pit.
Structural:
80 sq ft Baja bench
7' high rock waterfall/mini grotto/slide
Benches in corners of deep end
Fire pit to match rock waterfall/slide
Deck:
1,365 sq ft Belgard "La Fit Grani Slab" pavers with drainage
Belgard pool coping
Below are some pictures for some show and tell. I already started losing sleep when the demo didn't go as smoothly as I'd had hoped.

Our pool (view from the steps)

View from the diving board.

Shallow end view.

Current pool equipment.

Drained! (It took about 18 hours to drain)

Pool drained part 2

Almost in the deep end.

Our pool contractor suggested we have some fun with our drained pool...so we did some coloring.

Deck demolished! Partial coping demoed.

Fence section removed for Bobcat.

Anyone need a used diving board?

Deck demo 2

Electrical was just under the deck, we'll have to run new lines.

Plaster was removed 9/12
Work scheduled to be done/installed:
Pool:
Stonescape Pebble finish
Hayward LED colorlogic light
New tile (waterline/trim/mosaic)
Equipment to be installed:
Aquarite salt system
Hayward 400,000 BTU Heater
New equipment pad
Tristar pump
Plumbing:
Skimmer, auto cleaner line, 3 return lines, main drain split, auto-fill water leveling w/ overflow baffle, backwash line to sewer
Gas line for fire pit.
Structural:
80 sq ft Baja bench
7' high rock waterfall/mini grotto/slide
Benches in corners of deep end
Fire pit to match rock waterfall/slide
Deck:
1,365 sq ft Belgard "La Fit Grani Slab" pavers with drainage
Belgard pool coping
Below are some pictures for some show and tell. I already started losing sleep when the demo didn't go as smoothly as I'd had hoped.

Our pool (view from the steps)

View from the diving board.

Shallow end view.

Current pool equipment.

Drained! (It took about 18 hours to drain)

Pool drained part 2

Almost in the deep end.

Our pool contractor suggested we have some fun with our drained pool...so we did some coloring.

Deck demolished! Partial coping demoed.

Fence section removed for Bobcat.

Anyone need a used diving board?

Deck demo 2

Electrical was just under the deck, we'll have to run new lines.

Plaster was removed 9/12