Get the lights back on and be suspiciously whistling when they get home.Anything else I should do? The families on their way back home.
Get the lights back on and be suspiciously whistling when they get home.Anything else I should do? The families on their way back home.
I’m kinda torn here. Normally *anything* that pulls you from family time is not as important as the family. Not even work/money. Y’all can live under a bridge and still have each other.Family first brother
I have too many neighbor's. I don't want to Tick people offI would like to see all 3 lifted at the same time. Like, not the power company saying they removed and tested……. I’m talking you are off the grid 100%, and long enough to test the pool.
If you still have the voltage, Go make each neighbor flip their main breaker that touches the back of your property. (Nicely of course)
Then we move on to the 3 phase unbalance.
Add the temporary bond and go swimmingI’m kinda torn here. Normally *anything* that pulls you from family time is not as important as the family. Not even work/money. Y’all can live under a bridge and still have each other.
But not letting the family get shocked is sure up there on the list of things that *might* be more important than the Sunday afternoon family time. Lol.
Pulling the meter disconnected the two hots and then the neutral was the third. So, all three were disconnected.I would like to see all 3 lifted at the same time.
Remember he had continuity between the two boxes and in a meter box the neutral is tied to the box. The neutral coming in from the PC was tied to the meter box and the continuity means electrically the neutral was still complete. so two out of three were disconnected.Pulling the meter disconnected the two hots and then the neutral was the third. So, all three were disconnected.
Does this black mat isolate the neutral from the meter box?Remember he had continuity between the two boxes and in a meter box the neutral is tied to the box. The neutral coming in from the PC was tied to the meter box and the continuity means electrically the neutral was still complete. so two out of three were disconnected.
Exactly. And end up with all 3 removed at the same time for 100% off the grid.because the neutral can't be isolated and the hots are still in question for leakage the PC if you can get them to come out and disconnect the feeders one at a time would be one of the next things.