- Apr 2, 2018
- 67
- Pool Size
- 15000
- Surface
- Plaster
- Chlorine
- Salt Water Generator
- SWG Type
- Saline Generating Systems Breeze 540
Is it pretty typical to have to rebuild the tops of the steps after a demo before replastering an inground pool? This is the 2nd time I've used this builder at 2 different homes, and both times after the demo, the builder comes back and says he needs to charge me extra to rebuild the tops of the steps since they are mostly just sand and not concrete on top. I feel like I'm getting swindled. This seems like something that should be included in the price already.