Got the auto water leveler installed, wired all the equipment to the control box, and set the coping today. All that is left is to clean out the shell, acid wash it, and have the guys put the final finish on. That will be Friday if the weather cooperates. We will be having the decking installed in a few weeks (Stamped concrete) and I will be installing a waterfall some time in September. I am having a local company called Perfect Pool Fill do the water fill for me. They will use my well water, but based on a some testing they did they will hook up the appropriate filters and conditioners to make sure the water is good and I will not have any problems. They have been in business for 16 years and have a good reputation. So, my water should be in good shape to start. Can't wait to take that first plunge! 8)