Im in the process of getting my AGP set up. Few things, The company that dug the area and delivered the sand decided to spread approx. 1ton of the sand throughout the dig out.... Should I try to shovel as much as I can to expose the dirt under the pool base frame? Also on the pool from, are the little concrete blocks needed under the 'legs'?
I know when installing a pool, the sand should be inside the pool wall.. but the company came while I was at work (9am) when they were scheduled to come at after work (330pm). I also have the old pool liner im going to use to put under the sand.. well that was the plan atleast. so would the 1/2-3/4 inch of sand be an issue?
I know when installing a pool, the sand should be inside the pool wall.. but the company came while I was at work (9am) when they were scheduled to come at after work (330pm). I also have the old pool liner im going to use to put under the sand.. well that was the plan atleast. so would the 1/2-3/4 inch of sand be an issue?