Hello All,
I've got a few questions about a future AGP install we are trying to plan for here in westchester county ny. The local building dept. isn't really helpful and honestly a little snippy with us when we ask questions. They threw the electrical code print out at us and said your electrician has to pull a permit and we dont care about who builds the pool. A little rough if you ask me, but i suppose they deal with a lot of interesting cases.
My scenario; ~ 18ft from intended pool location, also near our generator, we have an existing gfci outlet on a 20A circuit. This is also underneath a deck, the height under the deck is 9ft so plenty of service space. Would it be a problem to keep the pump and sand filter in that area and plumb the lines to the pool under or above ground (no preference, whatever is most appropriate) with rigid PVC. The copper bonding would be done around the pool and all the way to the pump. Does this seem feasible.
I am reading up on how to assemble agp's and on the fence if i want to tackle it myself. I may have some other questions with the bonding for resin pools we are leaning towards...
Thanks in advance team
I've got a few questions about a future AGP install we are trying to plan for here in westchester county ny. The local building dept. isn't really helpful and honestly a little snippy with us when we ask questions. They threw the electrical code print out at us and said your electrician has to pull a permit and we dont care about who builds the pool. A little rough if you ask me, but i suppose they deal with a lot of interesting cases.
My scenario; ~ 18ft from intended pool location, also near our generator, we have an existing gfci outlet on a 20A circuit. This is also underneath a deck, the height under the deck is 9ft so plenty of service space. Would it be a problem to keep the pump and sand filter in that area and plumb the lines to the pool under or above ground (no preference, whatever is most appropriate) with rigid PVC. The copper bonding would be done around the pool and all the way to the pump. Does this seem feasible.
I am reading up on how to assemble agp's and on the fence if i want to tackle it myself. I may have some other questions with the bonding for resin pools we are leaning towards...
Thanks in advance team