Should I expect my ph levels to rise while bringing my pool up to shock level in preparation for closing. Should I wait to lower ph until chlorine levels drop. Looking to close on Sunday. Pool temperature is down to 55 degrees. Tested ph after I added the remains of the liquidator contents which brought levels up to 10 ppm from 4 with a goal of 14 to shock. Thanks for any info.