Currently my heat, pump and filter are sitting on 1'x1' thin pavers which do not appear to have been set down properly as they are not even. See previous post HERE for pix.
Anyway, since I want to redo the plumbing anyway to fix some things, probably would be a good time to put down a proper equipment pad ... hopefully before it gets too warm and the pool goes green. Why I did not get around to this over the winter is unknown
So what should I consider when putting down a cement pad?
How thick?
Footer needed around the edge?
Rebar needed? If so how much?
Should I consider an alternative to concrete like the AC plastic pads, or would they end up costing more?
Thanks.
Anyway, since I want to redo the plumbing anyway to fix some things, probably would be a good time to put down a proper equipment pad ... hopefully before it gets too warm and the pool goes green. Why I did not get around to this over the winter is unknown

So what should I consider when putting down a cement pad?
How thick?
Footer needed around the edge?
Rebar needed? If so how much?
Should I consider an alternative to concrete like the AC plastic pads, or would they end up costing more?
Thanks.