Pool Renovation (with Spa Addition)

fhyF39j.jpg
 
Concrete deck pour back is finished! Plaster prep starts Monday and plaster set for Friday!

Very pleased with how the spa cap turned out. Now just to wait 30 days for texture to get it all to match.

Added in some linear drains that are hard piped to spill into the same backwash line into the street.

With a little luck we should be swimming by the end of the month!
 
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.