Now that I have the electrical figured out for adding the IC60 thanks to the help form here, I’m looking to get advice on what changes I’m thinking about making to the plumbing. l’m building a deck for the equipment to sit on since I have to move the heater back a few feet to make room for the SWG and flow. I’ll be disconnecting the equipment and cutting 6 pipes that come out of the ground in order to raise the equipment about 8 inches. I’m considering putting unions on those 6 pipes in case I ever need to change or repair any valves in that area. Is this a good idea, or will that many unions be more prone to leaks and headaches? I’m also taking out the ozone generator pipe and replacing it with a single pipe. I was considering putting a “T” in that section and putting my Stenner pump injector there and keeping it hooked up in case my SWG ever has problems and I need to sanatize the pool while waiting on parts. Is that a good idea? I appreciate any help and advice!