A pool company hired to resurface my pool placed fresh red clay to fill in a muddy area in front of steps then used 3 yards of cement pool mix to resurface pool . The next day the area in front of steps was wet still so they put hydrolic cement over the area and put in a Tara vynal pool liner. Only allowing 1 day for cement to cure. And placed liner immediately over the hydrolic cement. 17 days later I reported to them the pool was leaking. I hired a leak detection company who determined the liner pulled away from steps in front of where the hydrolic cement was placed. Google says to wait 28 days before placing vynal liner over fresh cement to cure properly so liner doesn't shrink. The liner has definitely shrunk. Can someone please help me locate written proof regarding how long cement should cure before placing a vynal liner on it. I have contacted both the cement company and Tara manufacturer who would not supply this information. Thank you for your help.