We will be having our plaster and pebble installed soon and my PB sent this:
- Have Garden Hose On-Site
- Please hydrate pool 2X a day for 3 days before Plaster during Summer Months
- Plaster company will start water
- Do Not move hose – leave pool to fill slowly
- Do Not Shut Water Off Early , Shutting water off will void warranty , Shutting water off early can cause cracks and bathtub ring. Once pool is full (Center of Tile Line) move to Spa and fill (Center of tile line)
- After pool and spa are full call office to schedule startup of equipment
- First (7) Seven days are most important to insure quality of finish
- Must Brush Walls and Floor towards main drain minimum of (3) Three Times a day for (7) Seven Days **The more you brush the better the finish
- Pool & Spa does not provide chemicals for your pool. Please contact a pool maintenance company.