Is there a way to do the following on a Pentair System:
1. Reduce the pump speed during freeze protection, and
2. If Freeze Protection has been on for X hours, subtract these X hours from the primary pool schedule, automatically, on a daily basis to reduce scheduled runtime and save energy? Or a setting where the days schedule is disabled if Freeze Protection has run for more than a few hours. If I schedule my pool to run say 4 hours a day in the winter 10am-2pm, but freeze protection was on for say 5 hours, don't run that days scheduled pool run? Yes, it may be at a reduced pump RPM and technically I may not turnover the same amount of water through my filter, but I'd rather take the energy savings.
1. Reduce the pump speed during freeze protection, and
2. If Freeze Protection has been on for X hours, subtract these X hours from the primary pool schedule, automatically, on a daily basis to reduce scheduled runtime and save energy? Or a setting where the days schedule is disabled if Freeze Protection has run for more than a few hours. If I schedule my pool to run say 4 hours a day in the winter 10am-2pm, but freeze protection was on for say 5 hours, don't run that days scheduled pool run? Yes, it may be at a reduced pump RPM and technically I may not turnover the same amount of water through my filter, but I'd rather take the energy savings.
Last edited by a moderator: