Well I thought I did it all right. Build the top rail and put the pavers so the Y bracket was towards the edge ( pool side edge).
I build the pool and thought I had it all lined up but started filling with water and in the process of removing wrinkles must have moved the liner
I have legs they are not plumb if on the pavers but was able to move some of them in to get the legs plumb.
so my question is where should the legs sit on the pavers and if I have two legs with this issue should I drain the 4” of water and start over?