Well that's pretty unanimous!
It's all been pre-plumbed, wired and gas run. Drain will be put in with the rest of the deck.
Location 2's the best overall location. Hoping to make it a winter project. In the mean time the pool is 2 weeks from being finished!
It's all been pre-plumbed, wired and gas run. Drain will be put in with the rest of the deck.
Location 2's the best overall location. Hoping to make it a winter project. In the mean time the pool is 2 weeks from being finished!