Hello,
Been reading this topic a lot since I joined recently and we made the jump.. Our PB started yesterday. I'm sill new on this forum and completely green on posting pictures... so go easy on me.
It is a 21x41 "Mountain Lake" type of pool (goes to 8').
Here are the basic specs:
Filter Pentair TA60D
Pump Pentair SuperFlo 1.5 hp
Chlorinator Hayward CL-220
light IntelliBrite 5g LED
Liner 27 mil Dynastie/Blue Granite
2 main drains
2 multidirectional hydrostream return inlets
2 wall skimmers
2 in-floor cleaning heads
Heating: 500sf Solar panel install
Here are some of the progress we got since yesterday and today.
We found out that the yard is slanted more than expected so that leveling will be needed.
Few pictures of the construction, this is after all "Under Construction"
Yesterday:
Digging started.. easy enough
Yard starting to look like a mess
A couple of hours later we hit water! Was expecting it based on our area, but still... that was more $$$
Excavation co went and got gravels and started pumping.
Today:
Wall went up really quicly:
Followed by cement/Vermiculite
And the filter/pump. Now do we have a problem here?? The PB did not use any primer on any of the PVC. I asked him, told me not needed! What do you guys think? Inspector is coming tomorrow, but from reading some of the posts, no sure he'll say anything. I don't know what to do on this one...
So here we go for my first post... More to follow
Been reading this topic a lot since I joined recently and we made the jump.. Our PB started yesterday. I'm sill new on this forum and completely green on posting pictures... so go easy on me.
It is a 21x41 "Mountain Lake" type of pool (goes to 8').
Here are the basic specs:
Filter Pentair TA60D
Pump Pentair SuperFlo 1.5 hp
Chlorinator Hayward CL-220
light IntelliBrite 5g LED
Liner 27 mil Dynastie/Blue Granite
2 main drains
2 multidirectional hydrostream return inlets
2 wall skimmers
2 in-floor cleaning heads
Heating: 500sf Solar panel install
Here are some of the progress we got since yesterday and today.
We found out that the yard is slanted more than expected so that leveling will be needed.
Few pictures of the construction, this is after all "Under Construction"
Yesterday:
Digging started.. easy enough

Yard starting to look like a mess

A couple of hours later we hit water! Was expecting it based on our area, but still... that was more $$$

Excavation co went and got gravels and started pumping.

Today:
Wall went up really quicly:

Followed by cement/Vermiculite

And the filter/pump. Now do we have a problem here?? The PB did not use any primer on any of the PVC. I asked him, told me not needed! What do you guys think? Inspector is coming tomorrow, but from reading some of the posts, no sure he'll say anything. I don't know what to do on this one...

So here we go for my first post... More to follow