Like a dummy, I just dumped 3 or 4 bags of 1 pound shock into my pool to deal with the Algae. THEN I watched the SLAM method video and realized that I should tested my PH levels before working adding any chlorine. My question now is how should I proceed? How long can I wait before I can test my chlorine PH Levels again so I can proceed with the SLAM method.