Just got water in new pool. I think they will be hooking up all equipment this week. I plan
ti do a self install of AQR15.
Question. Since I will be closing in 30-45 days should I commission pool as chlorine and switch in spring or go salt now as pool comes on line?
Questiin: How long with water in pool and no pump or chemicals before I get algae? Supposed to rain all week here (Kansas) so not sure they will get me going.
Thanks
21,000 gallons, vinyl, Hayward Tristar VS 1.85hp, Hayward sand filter, TF100 test kit, M400 cleaner, Meyco rugged mesh cover, AQR15 (coming soon)
ti do a self install of AQR15.
Question. Since I will be closing in 30-45 days should I commission pool as chlorine and switch in spring or go salt now as pool comes on line?
Questiin: How long with water in pool and no pump or chemicals before I get algae? Supposed to rain all week here (Kansas) so not sure they will get me going.
Thanks
21,000 gallons, vinyl, Hayward Tristar VS 1.85hp, Hayward sand filter, TF100 test kit, M400 cleaner, Meyco rugged mesh cover, AQR15 (coming soon)