Hi, I posted this under Introductions but think it should be here.
Shell was completed about 4 weeks ago. Most of the Plumbing, Electrical, Tile and Brick Coping is done. There are raised cement areas by the 3 Sheer Decent Waterfalls to complete, deck jet plumbing, footers for the Screen Enclosure, Pavers, followed by the Screen Installation. The last thing to be done according to the PB is the WetEdge Mediterranean Pebble Finish. I thought this would be done before the Screen. Hope someone can comment on this.
Photo from 4-18. Only thing done in over a week was to grout bricks and plumbing for waterfalls and they started forms for raised areas in back of waterfalls. Also electrician did some wiring and havent' seen anyone since Friday.
Shell was completed about 4 weeks ago. Most of the Plumbing, Electrical, Tile and Brick Coping is done. There are raised cement areas by the 3 Sheer Decent Waterfalls to complete, deck jet plumbing, footers for the Screen Enclosure, Pavers, followed by the Screen Installation. The last thing to be done according to the PB is the WetEdge Mediterranean Pebble Finish. I thought this would be done before the Screen. Hope someone can comment on this.