Just changed the name of the thread to New Pool Install. Pool is going up tomorrow 5/23/20. Were going to start about 0900-1000.
I went in the basement n grabbed the old beaded track I originally bought with the first pool that I never used. I dont think I can use it because the top of it is to thick to fit into my stabilizer bars. I just don't think I can use it so I'm probably going to scrap the idea of using it all together n just use the jhook liner like I did last time.
I went out last night n cleaned the base of the pool floor of all debris from the last 2 weeks of wind blown Crud that accumulated on it. I'm probably going to have to drain the little bit of rain water that's in it so I can set the liner n move it around.
Suppose to have 3 other people helping me. We'll see how that goes. I'll keep ya'll updated.