Re: New Pool IG - Inland Empire, CA - GUNITE shoot today! 7/30
THUS far... it is looking good. We have a wall!
They spent some time this morning all looking at the spa and they tweaked a few things (redid a small corner of rebar as well) so... that made us feel good.
The gunite guys have actually had equipment out (total station, wire guides, actual measuring tapes) and I'm giving them some confidence on things being shaped and 'cut' properly. They have no issue (thus far) with shaping the seat and wall (pretty much done right now) and the baja reef. The boss mentioned issues with the PB and gave them a call, but all is well now... assuming they don't run out of gunite... it seems to be going well... we're excited watching them and seeing the true shape actually take shape...
THUS far... it is looking good. We have a wall!
They spent some time this morning all looking at the spa and they tweaked a few things (redid a small corner of rebar as well) so... that made us feel good.
The gunite guys have actually had equipment out (total station, wire guides, actual measuring tapes) and I'm giving them some confidence on things being shaped and 'cut' properly. They have no issue (thus far) with shaping the seat and wall (pretty much done right now) and the baja reef. The boss mentioned issues with the PB and gave them a call, but all is well now... assuming they don't run out of gunite... it seems to be going well... we're excited watching them and seeing the true shape actually take shape...
