Well the hard stuff is done (finding someone trustworthy to do the job).
The plans - basically a square shaped pool to maximize the use of our yard/pool space.
Pool to be 3.5-5.5' deep, pebble sheen interior with paver deck and screen enclosure.
The yard before we cleared out all the palms.
The 2 palms we had to save - they were too nice to get rid of. The one cluster was 2-3 tons with the dirt in the root ball! It took me 4 hours to dig out the root ball on the cluster, I couldn't believe all the rocks I was hitting.
Temporary home for the palms until after the pool is dug and landscaping begins.
Site Cleared and ready to go - layout this Friday!
I will keep the photos coming as progress takes place.

The plans - basically a square shaped pool to maximize the use of our yard/pool space.
Pool to be 3.5-5.5' deep, pebble sheen interior with paver deck and screen enclosure.

The yard before we cleared out all the palms.

The 2 palms we had to save - they were too nice to get rid of. The one cluster was 2-3 tons with the dirt in the root ball! It took me 4 hours to dig out the root ball on the cluster, I couldn't believe all the rocks I was hitting.


Temporary home for the palms until after the pool is dug and landscaping begins.

Site Cleared and ready to go - layout this Friday!


I will keep the photos coming as progress takes place.