New Pool Build In Progress - IG Vinyl

I dunno what happened but I missed the last few weeks of this. It was going on, and I was here, 🤷‍♂️.

Anywho, all caught up now and rooting away.

:kim:
:epds:
 
I dunno what happened but I missed the last few weeks of this. It was going on, and I was here, 🤷‍♂️.

Anywho, all caught up now and rooting away.

:kim:
:epds:
Thanks……
but you didn’t miss much other than work a day, not work 5 days, work a day, not work 4 days, ask for money, don’t collect money..LOL
 
  • Haha
Reactions: Newdude
Looks like they won't be out again today.

You know what really stinks is having the yard torn up and nothing getting done is having 4 dogs (2 Great Danes, and 2 mixed breeds). I can't let them out in the backyard to run and play since they took out a section of my fence for the concrete truck I did make a fenced in area on one side of the house but it's not big enough to run. Since the weather has cooled off and dried up I could go out with them in the back. They can't get in the pool so I don't have to worry about that, as long as I'm watching them. If I have enough orange fence left I can block off the section that's missing.

Between the build and the dogs my stress level is really high. I feel like I go to bed aggravated and then wake up aggravated, I don't like that.
 
  • Sad
Reactions: kimkats
I had PVC so it was easy to put back together each time. It was well worth the 15 mins to let the dogs roam for the next undisclosed amount of days/weeks. They've been muddy messes for months, but free range muddy messes.
 
  • Like
Reactions: aftrshok99
Came home after the grocery store and looked out back. They dropped off a bunch of pipe. Drilled and installed the 4 returns, stubbed them out, ildame for the led lights. They also installed the skimmer and plumbed it back to the equipment pad location. Little shocked to say the least.

Got the fence patched up so the dogs can run around.

Something on the stinky turn my stomach side. Unloading groceries and kept smelling something. It was a can of spam that wasn’t sealed, went rancid and leaked all over the cheese and butter in that bag…worst thing I’ve ever smelled.
 
  • Like
Reactions: Newdude

Enjoying this content?

Support TFP with a donation.

Give Support
It is much less weird than only having one skimmer. It's just the one on the deep end side wall ?

PS..... i LOVE the in wall ladders. Nice job (y)
Yes it’s just the one skimmer, I wish it had two but he doesn’t put more than one in on that size pool for whatever reason…cost??

At least it isn’t a small opening skimmer…lol
 
Stuff is getting done today....LOL

All the piping has been run to the equipment pad location. Backfilling with clean rock now as well as rough grading for the decking. It's amazing how much work he is getting done by himself compared to his two other guys that have been there when he hasn't been. The owner said he hopes to be pouring the decking at the end of the week. Not sure how that's gonna work, he still needs to adjust the side slopes in the deep end, scoop out some more for depth and I doubt they can do it all by hand. I suppose if he is there with more of his crew and actually work this week it could be ready for decking pour. It's going to be a beautiful week and weekend, next week rain in the forecast.

I'll post pictures tonight.
 

Enjoying this content?

Support TFP with a donation.

Give Support
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.