31 x 17'
7' spa
All Pentair Equipment
3HP VS Pump
CLI Caribbean Blue Mini Pebble
Travertine Torreon Stone Coping
Travertine Torreon Split Face Wall 2" x 4"
Glass Pool Tiles
Was a bit of a rocky start with Pool Builder.. Took 2 weeks to complete excavation but they are rolling pretty good now. Started Project on 1/11 and gunite finished on 1/29.
7' spa
All Pentair Equipment
3HP VS Pump
CLI Caribbean Blue Mini Pebble
Travertine Torreon Stone Coping
Travertine Torreon Split Face Wall 2" x 4"
Glass Pool Tiles
Was a bit of a rocky start with Pool Builder.. Took 2 weeks to complete excavation but they are rolling pretty good now. Started Project on 1/11 and gunite finished on 1/29.