So I started the process to build a 18X36 in ground pool. Similar to the drawing below, however there will be a square spa in place of the sun deck in that picture.
All equipment will be Hayward.
So I have the option between a DE filter and a sand filter, I read somewhere that the DE releases carcinogens. Not sure how big a deal this is or if It should deter me from choosing it.
I am also up in the air upgrading to a VS pump over the super pump for 1150.00. Is it worth the up charge?
I also think I will be upgrading from a pro logic to an omni logic depending on how much the up charge will be. Any idea how much more the omni costs over the pro ?
As far as backfill, i never even knew until i read here that its bad to use the dirt from excavation to backfill. Pretty much every builder in my area used the excavation dirt (which is mostly comprised of sandy material).
I asked the builder if I could backfill with gravel and I am waiting for a reply back. I assume I would just want 3/4" gray gravel? I priced this out locally at 26.50/Ton. My assumption is at 108ft trench around the pool at 2ft wide and 3 ft deep would need around 24 cubic yards or 34 tons. Does that sound about right?
Anything else im missing here or should look to upgrade?


All equipment will be Hayward.
Equipment | Hayward |
Controller | Pro-Logic Plus w/salt generator |
Lights | Color Logic |
Heater | H-Series Natural Gas 300,000 BTU |
Filter | S270T Sand Filter |
Pump | Super Pump 2HP - SP2615X20 |
Spa Booster Pump | 1.5 HP |
Salt | AquaRite 900 |
So I have the option between a DE filter and a sand filter, I read somewhere that the DE releases carcinogens. Not sure how big a deal this is or if It should deter me from choosing it.
I am also up in the air upgrading to a VS pump over the super pump for 1150.00. Is it worth the up charge?
I also think I will be upgrading from a pro logic to an omni logic depending on how much the up charge will be. Any idea how much more the omni costs over the pro ?
As far as backfill, i never even knew until i read here that its bad to use the dirt from excavation to backfill. Pretty much every builder in my area used the excavation dirt (which is mostly comprised of sandy material).
I asked the builder if I could backfill with gravel and I am waiting for a reply back. I assume I would just want 3/4" gray gravel? I priced this out locally at 26.50/Ton. My assumption is at 108ft trench around the pool at 2ft wide and 3 ft deep would need around 24 cubic yards or 34 tons. Does that sound about right?
Anything else im missing here or should look to upgrade?


Last edited: