New IG OOL. Almost done! Concrete questions.

OG OOLS

Active member
Jun 23, 2020
41
NB Canada
Hiyas!

Last big step of my new ool!

I am wrapping this insulation as per concrete contractor instructions.
6” of foam 1.5” thickness. Im duct taping it together around the perimeter. Is this correct?

Concrete will be poured 4-5”?! Brush finish.
do we pour right up to the foam?

Putting in forms “tomorrow”....
 

Attachments

  • 8F6B39AB-10DC-4C11-9D2E-1DD06CE2F326.jpeg
    8F6B39AB-10DC-4C11-9D2E-1DD06CE2F326.jpeg
    404.7 KB · Views: 43
  • 8B6CAB3C-3676-4B83-B8FA-B97CDA562814.jpeg
    8B6CAB3C-3676-4B83-B8FA-B97CDA562814.jpeg
    656 KB · Views: 44
Last edited:
Well, Im half wrapped and waiting for contractors....

Is there a product to go between concrete and coping? Flex joint or grout, or something else?
 

Attachments

  • B00C3063-CF89-45B5-87DA-8B8B002CF887.jpeg
    B00C3063-CF89-45B5-87DA-8B8B002CF887.jpeg
    709.6 KB · Views: 15
Last edited:
Thanks!
I’ll look into the foam rope for the edge.

I am thinking about doing a second layer of foam. This will make an overlap at the joints and give extra protection? Does concrete pour right up to the foam or do I need a different form around the pool edge?
 
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.