New IG OOL. Almost done! Concrete questions.

OG OOLS

Member
Jun 23, 2020
18
NB Canada
Hiyas!

Last big step of my new ool!

I am wrapping this insulation as per concrete contractor instructions.
6” of foam 1.5” thickness. Im duct taping it together around the perimeter. Is this correct?

Concrete will be poured 4-5”?! Brush finish.
do we pour right up to the foam?

Putting in forms “tomorrow”....
 

Attachments

Last edited:

OG OOLS

Member
Jun 23, 2020
18
NB Canada
Thanks!
I’ll look into the foam rope for the edge.

I am thinking about doing a second layer of foam. This will make an overlap at the joints and give extra protection? Does concrete pour right up to the foam or do I need a different form around the pool edge?