I just had a new Hayward H200 gas heater installed. The installer put a new check valve on the discharge side of the sand filter (before inlet to the heater). I also have an existing SWG. Shouldn’t the check valve been installed at the discharge of the heater prior to the SWG?? I haven’t said anything to the installer yet , meeting him this weekend to pay for the install. Want to know if this was installed correctly.