New from TN

BB70Chevelle

Member
May 17, 2021
11
TN
Placed an order for our first pool yesterday and we are very excited to add it to our backyard after putting in a basketball court this winter and want to make sure we do it right! Have been lurking a lot here trying to learn all I can before it gets installed. Right now looking at 8 to 10 weeks so trying to gather the necessary items before then. We went with a 24’ 52” tall vinyl above ground pool with two speed pump and cartridge filter. Ordered a Taylor k-2006c test kit and a deluxe chemical package from the pool factory to get us started.
 

Attachments

  • CADA328E-582B-4907-B48D-891EB4CF5DF3.jpeg
    CADA328E-582B-4907-B48D-891EB4CF5DF3.jpeg
    606.1 KB · Views: 0