New Freeform Build, SoCal 92882

bgatxy

Member
Jul 6, 2021
19
SoCal
Build in progress since June, posting here to share and document.

Overview-
18x33 free form
12" raised bond beam
8' spa
2 pumps/400k BTU heater/Intellichlor-Salt
2 sheer descents
4 lights (3 pool/1 spa)
1 fire trough/1 fire pit

Timeline-
3/19/21, signed contract
6/18/21, 13 weeks from signature we break ground with demo
6/30/21, demo/dig/rebar complete
8/12/21, initial plumbing complete
9/14/21, initial pool electric complete
10/6/21, pre gunite inspection
10/14/21, gunite shot
11/12/21, coping pour
12/12/21, tile complete (except for back wrap of spa)

We changed course slightly from the initial mock up design, in pool shape, firepit location, and going tile instead of stone.
 

Attachments

  • 1.jpg
    1.jpg
    455.4 KB · Views: 184
  • 2.jpg
    2.jpg
    389.2 KB · Views: 178
  • 3.jpg
    3.jpg
    371.4 KB · Views: 177
  • 4.jpg
    4.jpg
    311.6 KB · Views: 182

Enjoying this content?

Support TFP with a donation.

Give Support

Enjoying this content?

Support TFP with a donation.

Give Support
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.