Build in progress since June, posting here to share and document.
Overview-
18x33 free form
12" raised bond beam
8' spa
2 pumps/400k BTU heater/Intellichlor-Salt
2 sheer descents
4 lights (3 pool/1 spa)
1 fire trough/1 fire pit
Timeline-
3/19/21, signed contract
6/18/21, 13 weeks from signature we break ground with demo
6/30/21, demo/dig/rebar complete
8/12/21, initial plumbing complete
9/14/21, initial pool electric complete
10/6/21, pre gunite inspection
10/14/21, gunite shot
11/12/21, coping pour
12/12/21, tile complete (except for back wrap of spa)
We changed course slightly from the initial mock up design, in pool shape, firepit location, and going tile instead of stone.
Overview-
18x33 free form
12" raised bond beam
8' spa
2 pumps/400k BTU heater/Intellichlor-Salt
2 sheer descents
4 lights (3 pool/1 spa)
1 fire trough/1 fire pit
Timeline-
3/19/21, signed contract
6/18/21, 13 weeks from signature we break ground with demo
6/30/21, demo/dig/rebar complete
8/12/21, initial plumbing complete
9/14/21, initial pool electric complete
10/6/21, pre gunite inspection
10/14/21, gunite shot
11/12/21, coping pour
12/12/21, tile complete (except for back wrap of spa)
We changed course slightly from the initial mock up design, in pool shape, firepit location, and going tile instead of stone.