New Equipment Pad Cure Time

pool512

Gold Supporter
Jul 12, 2021
77
Georgetown, TX
Pool Size
15000
Surface
Plaster
Chlorine
Salt Water Generator
SWG Type
Pentair Intellichlor IC-40
We poured a new larger pad yesterday to accommodate our new heater, and we're itching to hook everything back up (and correct our chemistry post-shutdown). I searched online for a good answer to when we could put the equipment back on, but am finding answers all over the map (and most geared towards non-equipment-pad slabs). I found 1 day, 2 days, 7 days (fairly common), 10 days, and of course 28 days to fully cure. We have the pad covered in plastic and are keeping it damp (rain and cooler temps are helping).

Can anybody provide guidance on when it would be safe to put our equipment back on the pad? We have 2 pumps, a 60 sq ft DE filter (probably the heaviest item when loaded with water and powder), and a new Raypak heater (349 lbs). Thank you!
 
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.