- Jul 12, 2021
- 86
- Pool Size
- 15000
- Surface
- Plaster
- Chlorine
- Salt Water Generator
- SWG Type
- Pentair Intellichlor IC-40
We poured a new larger pad yesterday to accommodate our new heater, and we're itching to hook everything back up (and correct our chemistry post-shutdown). I searched online for a good answer to when we could put the equipment back on, but am finding answers all over the map (and most geared towards non-equipment-pad slabs). I found 1 day, 2 days, 7 days (fairly common), 10 days, and of course 28 days to fully cure. We have the pad covered in plastic and are keeping it damp (rain and cooler temps are helping).
Can anybody provide guidance on when it would be safe to put our equipment back on the pad? We have 2 pumps, a 60 sq ft DE filter (probably the heaviest item when loaded with water and powder), and a new Raypak heater (349 lbs). Thank you!
Can anybody provide guidance on when it would be safe to put our equipment back on the pad? We have 2 pumps, a 60 sq ft DE filter (probably the heaviest item when loaded with water and powder), and a new Raypak heater (349 lbs). Thank you!