ON HOLD
Everything on this project moved along at warp speed through day 21, with just the plaster phase left to do. But we learned that once plastered and filled with water, you're apparently supposed to brush the pool a couple of times per day for a week or two. Since we're headed to Napa Valley for 9 days, PB decided it was better to put things on hold until we get back. Plans now are for them to plaster and fill with water just as we return, then give us Pool School and let us begin the brushing-down phase of things (in addition to the enjoying phase!!).
So... we press the PAUSE button on things for a bit...
Everything on this project moved along at warp speed through day 21, with just the plaster phase left to do. But we learned that once plastered and filled with water, you're apparently supposed to brush the pool a couple of times per day for a week or two. Since we're headed to Napa Valley for 9 days, PB decided it was better to put things on hold until we get back. Plans now are for them to plaster and fill with water just as we return, then give us Pool School and let us begin the brushing-down phase of things (in addition to the enjoying phase!!).
So... we press the PAUSE button on things for a bit...