They just put in 3 sides for now. They still have to add the grout, clean, etc. Took them a while to set everything up.
Apparently on the sides where the cover rails will be embedded calls for very accurate measurements. They spent a lot of time on the sides where the cover tracks will be put in!
They are coming back tomorrow to finish the water line. When the cover tracks are installed, the wall guys will be back and then the tile guys again to tile the wall.
It's too bright to get good light exposure, tried my best below:
Apparently on the sides where the cover rails will be embedded calls for very accurate measurements. They spent a lot of time on the sides where the cover tracks will be put in!
They are coming back tomorrow to finish the water line. When the cover tracks are installed, the wall guys will be back and then the tile guys again to tile the wall.
It's too bright to get good light exposure, tried my best below: