I’m impressed with how quickly your build has progressed! Ours moved slowly. It took just over two months for us to get from dig to fill. We had lots of rain delays though. It felt like it rained all of November.
Your pool is looking good! I agree with you that the mud hassle is SO real. At least you’ve still got a deck to oversee the pool construction. Our back door opened straight to mud for two months. It was so annoying. Anytime we wanted to check out the pool it meant getting muddy.
My advice is to download the pool school book and read it all. It’s the TFP bible.
You can download it here:
Pool school book
Also I’ve attached the NPC plaster start up card. It saved my life. The TFP website went down switching to this new platform the day after my pool was filled. This is what you’ll need to do to care for your plaster for the first 28-days. Be sure you order your TF-100 kit, speed stir, and a wall whale brush. The wall whale makes brushing(which you will do a lot) so easy. Highly recommend it.
Can’t wait to see your pool when it’s done. Lots of good info and people here. I love reading build threads. It helped me learn and it’s great to see people’s dreams come to life. I even read SuzfromTexas entire 78-page build thread. That was amazing!
Hope the rest of your build is trouble free!
And keep the pic’s coming!