More work. PB says they will be out early next week to lay out the cabana. They need to know where everything will go so they can run the power and electrical to where the pool equipment will be located on the cabana foundation. Once the plumbers and electricians are done, we are ready for decking.
One of our pups cant wait till all of this is done.
The builder had the spillway edge done straight because he said you get better water flow that way. I'm not sure I like it with all the other "natural" edges. If I leave it, I told him they need to fix where you can see the saw cuts.
One of our pups cant wait till all of this is done.
The builder had the spillway edge done straight because he said you get better water flow that way. I'm not sure I like it with all the other "natural" edges. If I leave it, I told him they need to fix where you can see the saw cuts.