Yesterday they were out building up and framing out the new equippmebt pad plus my additional pad footage. This interfered with the arbor guys who showed up two hours later and essentially ended up only dropping off materials.
The concrete guys still need to come back to fix somethings before they pour concrete.
That said it’s about 8pm and arbor guys have already put in 12 hours today. They are trying to finish everything but the tounge and groove ceiling and decorative trim work. They will come back and do all the after the electrician comes out to do the rest or the electrical.
Patio and deck should be done Monday or Tuesday. I think they are planning for electrical and equipment instal a week after. I’m hoping they can wrap everything up by mid July.
The concrete guys still need to come back to fix somethings before they pour concrete.
That said it’s about 8pm and arbor guys have already put in 12 hours today. They are trying to finish everything but the tounge and groove ceiling and decorative trim work. They will come back and do all the after the electrician comes out to do the rest or the electrical.
Patio and deck should be done Monday or Tuesday. I think they are planning for electrical and equipment instal a week after. I’m hoping they can wrap everything up by mid July.