What a difference a couple days and some sunshine makes!
We have concrete! I just love our deck! Can not WAIT to put out some furniture and enjoy this new space.
The crew came back out and fixed all the washed away areas and prepped the deck...then this morning they were here at 6:30am to get the concrete poured.
Here it is with the cantilever forms in place...
They began with the concrete on our pad for the spa...we decided on a free-standing unit...no spillover for us...
They did quite a bit wheelbarrow load by load...filling in piers around the outer edges of the deck...they spent a lot of time with the pad, making sure it was level for the spa...
This part was great (well, I thought it was). As the concrete was poured to the edges of the pool one fella would "tap, tap, tap" with the piece of wood to be sure it got in all the space...wait till you see the end!
A couple of the guys did all this detail work by hand...builder called it "hand-tooling" the edge around the pool...
And here is one fella measuring around the perimeter for the hand-tooling...
I wondered how in the world this man would get out! He spent a LOT of time inside the pool cleaning up the inner edge of the deck. LOVE this!
And here's a shot of all the completed area:
We are so happy with this work! All the crews have said that all the rain was the best thing to happen for our deck. It just made it that much more compacted. More clean up to happen tomorrow...
Thanks for checking in!
Sara