Well, my wife decided she wanted a pool and it was her dream to have one of those rock slides so we finally started getting it done. I could live with or without a pool but now that it is being built I do have to admit I am excited about it…
Original sketched plan:
Picking a spot in the yard:
The dig (3.6' to 8', actually 8.5'): The dig crew showed up late in the afternoon but really wanted to finish it the same day, I brought out some flood lights and they did! Lol…
Time for some steel! Bond beam (4) #4 bars continuous at 8" o.c.e.w. (all steel #4's)
Gunite being shot…
Some plumbing pics, 2" plumbing:
Waterline tile choice: