Our new pool is up and filling from our creek using a sump pump and running through the sand filter and a duda filter. We are currently at about 14" of water, approximately 4500 gal of water. The only thing we added was 12.5% chlorine using Pool Math, aiming for 3 PPM. It got us to 1.8 PPM. Wasn't sure how long we should wait to test after adding. We waited at least an hour.
So, currently:
FC 1.8 ppm
pH 8 or more (it took 2 drops to bring it down to 7.5) in the tester
TA 250 ppm
We plan to continue to add chlorine as it fills. Should we be aiming for 3ppm or more than that at this time.
Is there anything else we can start adding (CYA maybe?) in order to get a head start on balancing? We anticipate it taking a couple more days to fill.
It's important to note that we are running the fill water through the sand filter pump, so we can't filter as we are adding chemicals. We just brushed the chlorine in.
Thank you!
So, currently:
FC 1.8 ppm
pH 8 or more (it took 2 drops to bring it down to 7.5) in the tester
TA 250 ppm
We plan to continue to add chlorine as it fills. Should we be aiming for 3ppm or more than that at this time.
Is there anything else we can start adding (CYA maybe?) in order to get a head start on balancing? We anticipate it taking a couple more days to fill.
It's important to note that we are running the fill water through the sand filter pump, so we can't filter as we are adding chemicals. We just brushed the chlorine in.
Thank you!