Hello,
I decided to move my pump/filter and set up all new electric as well for a new heater.
I will also be adding a salt water generator.
How does my proposed plumbing situation look?
Am I missing anything?
I know the SWG flow switch is supposed to do after the heater and before the salt cell, but I am running out of room coming out of the heater. Can it go where I proposed?
thanks
PS The hoses in the pic are for display only, I will be using 1.5 in pcv hard pipe in ground and some flex out of ground.
I decided to move my pump/filter and set up all new electric as well for a new heater.
I will also be adding a salt water generator.
How does my proposed plumbing situation look?
Am I missing anything?
I know the SWG flow switch is supposed to do after the heater and before the salt cell, but I am running out of room coming out of the heater. Can it go where I proposed?
thanks
PS The hoses in the pic are for display only, I will be using 1.5 in pcv hard pipe in ground and some flex out of ground.
Last edited: