I'm in the process of planning an onground pool install, the back side of the design will be exposed almost 36".
I have two options on where I'd like to locate the equipment pad, one right beside the house nearest to the electrical panel. This will have at least a 40' run of lines just to get to one side of the pool, likey 60' for each return.
The other is a 20' run total where a shed is already located, the only issue is that we've got 12"-16" max of earth before I hit a limestone shelf. Digging through limestone is not an option.
I'm located in south east Ontario, Canada we constantly get freezing temperatures in the winter.
What are your thoughts?
Thanks
I have two options on where I'd like to locate the equipment pad, one right beside the house nearest to the electrical panel. This will have at least a 40' run of lines just to get to one side of the pool, likey 60' for each return.
The other is a 20' run total where a shed is already located, the only issue is that we've got 12"-16" max of earth before I hit a limestone shelf. Digging through limestone is not an option.
I'm located in south east Ontario, Canada we constantly get freezing temperatures in the winter.
What are your thoughts?
Thanks